Longfor River City Tianhua

Inquire About a Similar Project
Location:Hangzhou, Zhejiang, China
Completion Year:2019
Application Area:500,000 m²
Core Products:Perforated aluminum panels – applied to the sales office facade and landscape screen walls, creating a \"starry\" dotted texture that adds visual richness and infinite imagination to the space ; Perforated aluminum panels with varying aperture scales – used to achieve the \"lightweight and transparent\" effect, allowing architectural landscape to blend with each other.
Key Finish:Perforated finish with custom hole patterns – the perforated aluminum panels feature starry dotted patterns and varying aperture scales to create a \"gauze-like\" texture and dynamic light-and-shadow effects; PVDF fluorocarbon coating (assumed based on industry standards for exterior architectural aluminum products)
Key Challenges:① TOD Large-Scale Mixed-Use Complex – As a 500,000 m² \"TOD complex\" integrating Longfor Tianjie retail, hotel, high-rise residences, townhouses, and villas, the project demanded high-volume, consistent supply of aluminum products . Our perforated aluminum panels were deployed across the demonstration area to showcase the project\'s quality and design sophistication. ② \"Introverted Enclosed Space\" Design Concept – The demonstration area draws inspiration from classical Chinese gardens, employing landscape progression and \"step-by-step scenery change\" design . Our custom perforated aluminum panels were precisely fabricated for the landscape screen walls, courtyard enclosures, and architectural facades, creating a serene, layered spatial experience within a noisy urban environment . ③ Complex Architectural Form Language – The sales office roof features a mountain-fold \"sawtooth\" form inspired by the natural silhouette of Hangzhou\'s Xizhao Mountain , connecting the buildings into a cohesive whole. Our perforated aluminum panels with varying aperture patterns required high-precision fabrication to achieve the \"lightweight, transparent, and airy\" aesthetic, with partial perforated treatments allowing architectural and landscape elements to visually interpenetrate . ④ Rapid Construction Timeline – The demonstration area was completed within an 8-month timeframe (January to August 2018) , requiring our company to provide timely delivery and reliable supply chain management to meet the fast-track construction schedule